Product Introduction
Prefabricated folding container house uses high-strength lightweight steel as the main material, combined with color steel plate as the enclosure structure. Based on the use of hinge and slide rail system, the house can be unfolded from the folded state into a spacious living or office space.

Product Features
Sturdy And Durable
The prefabricated folding container house is made of high-strength steel frame with a yield strength of over 345MPa, which can withstand heavy pressure. It can withstand strong winds of level 12 and is also stable in areas with an earthquake fortification intensity of 8 degrees. The normal service life exceeds 20 years.
Waterproof Performance
The top and surrounding walls of the prefabricated folding container house are made of special waterproof sheets with a surface coating thickness of over 0.5mm. They are equipped with sealing strips (waterproof sealing of over 99%) and waterproof rivets, so the indoor environment is always dry and not afraid of rain and dew erosion.
Thermal Insulation Properties
The walls of the prefabricated folding container house are filled with high-quality rock wool and other thermal insulation materials, with a thermal conductivity as low as 0.035 - 0.047W/(m・K). The indoor temperature is 5 - 8℃ lower than the outdoor temperature in summer and 3 - 6℃ higher in winter.

How to install
Site Preparation
Clean and level the installation site to ensure that the ground is solid and level and can bear the weight of the prefabricated folding container house. Determine the placement location according to the design plan and mark it.
Foundation Construction
According to the size and weight of the prefabricated folding container house, concrete foundation, ground beam foundation, etc. can be selected. The concrete foundation needs to cast a flat concrete platform; the ground beam foundation needs to be laid and fixed along the outline of the house.
Container Lifting And Placement
Use a crane or hoist to lift the prefabricated folding container house to the top of the predetermined foundation position, slowly lower it and accurately align it to ensure that the container is placed stably and accurately, and fits tightly with the foundation.
Unfolding And Fixing
Unfold the folding part, unlock and unfold the side panels, top panels, etc. in sequence according to the operating instructions. After unfolding, use bolts and other connectors to tightly fix each part to ensure that the structure of the prefabricated folding container house is stable and the connection parts are firm and reliable.
Water And Electricity Connection
Connect the water and electricity interface of the prefabricated folding container house to the external water and electricity supply system. The water pipe connection must be sealed without leakage, and the wire connection must follow the electrical installation specifications to ensure stable water and electricity supply.
Interior Decoration And Debugging
After completing the main installation of the prefabricated folding container house, carry out interior decoration work, such as wall and floor treatment, door and window installation, furniture arrangement, etc. After the decoration is completed, debug the overall performance of the house, check whether the water and electricity facilities, door and window opening and closing, structural stability, etc. meet the requirements, and ensure normal use.